France
Latour-de-Carol to Olette Cab Ride
Watch on YouTubeAbout this journey
The journey begins at Latour-de-Carol–Enveitg station, one of the few terminals in the world where three different gauges converge: 1,435 mm standard gauge toward Toulouse, 1,668 mm Iberian gauge toward Barcelona, and the 1,000 mm metre gauge of the Ligne de Cerdagne. Each line also operates on a different voltage, with the Cerdagne line drawing 850 volts DC from a third rail, powered by hydro-electric stations on the River Têt.
The Ligne de Cerdagne — known as the Train Jaune, or Yellow Train, after its yellow-and-red livery derived from the colours of the Catalan flag — is 63 kilometres long in its entirety. Construction began in 1903, and the full extension to Latour-de-Carol was completed in 1927. Along the route, the line crosses two structures classified as Historic Monuments: the Pont Séjourné, a 236.70-metre masonry viaduct at kilometre 18.002 in Fontpédrouse, and the Pont Gisclard at kilometre 24.422, a 253-metre suspension bridge and the only one of its kind on an operating railway in France. In 2023, a major project replaced 12 of the Pont Gisclard's suspension cables. The line reaches its highest point at Bolquère-Eyne, the highest railway station in France at 1,593 metres, before descending through the Têt valley toward the endpoint at Olette.
Route
- Start Latour-de-Carol
- End Olette
- Distance ~52.4 km
- Filmed 2023-06
Chapters
- 0:00 Preview
- 01:48 Latour-de-Carol
- 02:00 TRAIN TO TOULOUSE (STANDARD GAUGE)
- 02:35 1668mm (IBERIAN GAUGE) TO BARCELONA
- 03:15 TO BARCELONA
- 04:01 850V THIRD-RAIL
- 04:40 Béna-Fanès
- 07:40 Pla-de-Llaura Tunnel (380 m)
- 09:55 Rahur River (24 m)
- 10:28 Ur-Les Escaldes
- 16:26 Bridge over N 116 (25 m)
- 17:03 Bourg-Madame
- 24:17 Osséja
- 34:05 Sainte-Léocadie
- 38:13 Err
- 40:52 #47 LEVEL CROSSING, N116 ROAD
- 42:21 Saillagouse
- 42:48 5 min missing, camera overheat
- 44:41 Saint-Vincent Tunnel (106 m)
- 49:11 Col Rigat Gallery (121 m)
- 52:48 Eyne Viaduct (93 m)
- 53:15 Via Gallery (77 m)
- 58:02 Font-Romeu-Odeillo-Via
- 1:08:43 Bolquère - Eyne
- 1:08:55 HIGHEST POINT (1593M)
- 1:09:24 #32 LEVEL CROSSING, N116 ROAD
- 1:10:14 #31 LEVEL CROSSING, N116 ROAD
- 1:13:40 Mont-Louis - La Cabanasse
- 1:17:12 Jardo Viaduct (88 m)
- 1:18:28 Saint-Pierre Tunnel (64 m)
- 1:19:18 Planès Tunnel (337 m)
- 1:20:18 Planès
- 1:21:50 Gisclard Bridge (Têt) (254 m)
- 1:23:05 Cassagne Gorge Bridge (39 m)
- 1:23:12 Terre-Blanque Tunnel (159 m)
- 1:23:47 Rafines Bridge (73 m)
- 1:24:17 #26 LEVEL CROSSING, N116 ROAD
- 1:24:41 Paillat Tunnel (122 m)
- 1:25:40 Sauto
- 1:26:03 Castagnal RIVER bridge (75 m)
- 1:26:20 Coste Litge Tunnel (56 m)
- 1:26:35 Naheille Tunnel (63 m)
- 1:27:16 Castagnal RIVER Bridge (17 m)
- 1:27:20 Castagnal Tunnel (159 m)
- 1:29:03 Oratory Tunnel (94 m)
- 1:29:32 Devèze Tunnel (292 m)
- 1:31:07 TÊT RIVER CANYON
- 1:32:29 Fontpédrouse-Saint-Thomas-les-Bains
- 1:33:43 Liou Tunnel (119 m)
- 1:34:09 Molles Tunnel (97 m)
- 1:35:21 San Rouma Tunnel (203 m)
- 1:36:35 SÉJOURNE VIADUCT (N116/TÊT, 237M)
- 1:38:16 Ramonails GORGE BRIDGE (60 m)
- 1:40:27 Thuès-Carença
- 1:44:40 Mas Des Sources
- 1:45:38 Thuès-les-Bains
- 1:46:15 Sans no 2 Tunnel (120 m)
- 1:46:59 Sans no 1 Tunnel (55 m)
- 1:47:29 Nyer 3 Viaduct (51 m)
- 1:49:18 Nyer 2 Viaduct (49 m)
- 1:49:56 Nyer Tunnel (137 m)
- 1:50:16 Nyer 1 Viaduct (93 m)
- 1:50:32 Nyers
- 1:51:46 Nyers Avalanche Gallery (52 m)
- 1:53:08 TÊT RIVER BRIDGE (28M)
- 1:54:40 Olette - Canaveilles-les-Bains