Brazil
Pedro Nolasco(ES) to Baixo Guandu (es) Cab Ride
Watch on YouTubeAbout this journey
Pedro Nolasco station in Cariacica, opened on 20 May 1985, is the western terminus of the Estrada de Ferro Vitória a Minas — the EFVM — and takes its name from the engineer who led the railway's initial construction. The line itself dates to a decree-law of February 1902, with the first 30-kilometre stretch inaugurated on 13 May 1904. What began as a route for exporting coffee shifted focus by 1908 toward the iron ore of Itabira, and in 1942 Companhia Vale do Rio Doce — now Vale S.A. — assumed responsibility for the railway under the Washington Accords.
Today the EFVM is one of only two surviving inter-city passenger railways in Brazil, covering 664 kilometres and serving 30 stopping points across 42 municipalities on metre-gauge track. The line's maximum permitted speed is 67 km/h. For much of its length the route runs alongside the Doce River through alternating Atlantic Forest and Cerrado vegetation. The locomotive hauling the train — a GE BB40-9WM — is a type the railway also deploys on its heavy ore workings. The EFVM's rails reached Baixo Guandu in 1907, and the town's early growth was shaped in part by the railway's arrival. That connection between industrial haulage and rural community defines the character of the journey from beginning to end.
Route
- Start Pedro Nolasco(ES)
- End Baixo Guandu (es)
- Distance ~174.1 km
- Filmed 2023-11
Chapters
- 0:00 Preview
- 02:34 PEDRO NOLASCO STATION
- 04:30 ← FROM CARGO YARD
- 04:54 FROM CAPUABA PORT →
- 06:04 → TO MAINTENANCE YARD
- 07:01 → TO CARGO YARD
- 07:39 → From CARGO YARD
- 08:45 → VITÓRIA BAY (ATLANTIC OCEAN)
- 10:50 ← CARGO MAINTENANCE YARD
- 12:37 CONTROL POINT 01
- 13:27 → CARGO TERMINAL
- 14:07 ← FROM COAL TERMINAL
- 19:03 FLEXAL (ES)
- 28:21 LTE TOWER KM 009
- 31:06 ← IVECO/CODEPE FACTORY →
- 38:52 TO VALE TUBARÃO PORT →
- 39:24 FROM VALE TUBARÃO PORT →
- 39:34 CONTROL POINT 03
- 39:44 JOINED THE EFVM MAINLINE (EF-262)
- 49:13 TO AROABA IRON MINE →
- 51:31 FROM AROABA IRON MINE →
- 57:46 → GE BB40-9WM (1221)
- 1:04:19 RIBEIRÃO SAUANHA
- 1:04:51 RIBEIRÃO BRACO DE NORTE
- 1:05:15 → GE BB40-9WM (1298)
- 1:15:24 FUNDÃO (ES)
- 1:26:35 TUNNEL (55,4KM)
- 1:30:08 → PEDRO PALACIOS (ES)
- 1:36:03 ARICANGA (ES)
- 1:40:16 → TRACK INSPECTION VEHICLE
- 1:42:42 ← HIGHWAY BR-101
- 1:43:24 TUNNEL (69,7KM)
- 1:47:44 → GE BB40-9WM (1271)
- 1:48:27 → GE BB40-9WM (1166)
- 1:48:45 PIRAQUE-AÇU (ES)
- 1:54:27 TO CARGO TERMINAL →
- 1:55:06 FROM CARGO TERMINAL →
- 1:55:14 TO BARRA DE RIACHO PORT
- 2:01:17 CAVALINHO (ES) →
- 2:03:00 ← CUT STABILZATION WORK
- 2:20:07 LAKE PAU GIGANTE →
- 2:21:13 → GE BB40-9WM (1121)
- 2:24:01 ENTERING RI0 DOCE VALLEY
- 2:25:33 ← TO CARGO YARD
- 2:27:01 FOLLOWING RIVER DOCE NEXT 320KM
- 2:29:41 TUNNEL (123,3m)
- 2:43:04 RIVER SANTA MARIA DO RIO DOCE
- 2:45:23 COLATINA CITY CENTER →
- 2:46:15 TUNNEL (130,1km)
- 2:47:02 COLATINA (ES)
- 2:52:08 ← VALE MAINTENANCE DEPOT
- 2:52:52 ← EMD DDM45 (839)
- 2:53:00 → RIVER Rio DOCE
- 2:57:32 ← GE BB40-9WM (1260 + 1111)
- 3:09:36 ITAPINA (ES)
- 3:09:53 UNFINISHED BRIDGE OVER RIO DOCE
- 3:10:23 RIVER LAJE
- 3:10:29 GE BB40-9WM (1220)
- 3:16:42 GE BB40-8M (1225) →
- 3:20:33 MASCARENHAS (ES)
- 3:21:03 MASCARENHAS HYDROELECTRIC PLANT →
- 3:23:18 GE BB40-8M (1297) →
- 3:30:29 BAIXO GUANDU (ES)