France

Langeac to Clermont-Ferrand Cab Ride

Filmed 2026-08 Published 17 October 2026 Line: Ligne de Saint-Germain-des-Fossés à Nîmes-Courbessac
Watch on YouTube

About this journey

Langeac station sits in the Allier gorge at the southern end of this TER run, where the Ligne de Saint-Germain-des-Fossés à Nîmes-Courbessac begins its long climb northward before descending into the plains of the Auvergne. The line was completed in 1870 across the Massif Central, and the Freycinet plan of 1879 — which set out to connect each French sub-prefecture to the rail network — helped cement this corridor as a lasting artery through the volcanic interior. South of Clermont-La Pardieu the line is non-electrified, and it is here that the SNCF Class X73500 diesel railcar earns its keep on a route carrying only three train pairs a day in each direction.

Departing Langeac, the train crosses the Viaduc de Costet, a 263 m bridge spanning the Allier, almost immediately. The line then climbs to Saint-Georges-d'Aurac, the highest station stop on this segment at 572 m, before beginning a long, steady descent. Through Paulhaguet and past the Viaduc de la Bageasse — 81 m over the Allier — the route reaches Brioude, a junction where around ten daily train pairs branch off toward Clermont-Ferrand independently. At Arvant the Ligne de Figeac à Arvant converges, and the track widens to double from that point onward. Beyond Brassac-les-Mines–Sainte-Florine the 43 m Tunnel de La Roche briefly interrupts the valley scenery before the line continues through Issoire, crossing the 118 m Viaduc du Piat over the Allier just south of town.

North of Issoire the Allier remains a near-constant companion, visible through the trees as the train passes Parent–Coudes–Champeix and Vic-le-Comte, where the 122 m Viaduc de Longues marks another river crossing. Dormant volcanic hills — remnants of the Chaîne des Puys, a 32-kilometre chain of around 80 extinct volcanoes — begin to appear on the western horizon as the train approaches the agglomeration. Electrification wires appear at Clermont-La Pardieu station, marking the transition from rural diesel territory to the electrified suburban approach. Clermont-Ferrand station, which opened in 1855 and was renovated between 2010 and 2018, brings the journey to a close — a contrast to the quiet gorges and basalt hills that defined the preceding 101.3 km from Langeac.

Route

  • Start Langeac
  • End Clermont-Ferrand
  • Distance ~101.4 km
  • Filmed 2026-08

Chapters