France
Puget-Théniers to Annot Cab Ride
Watch on YouTubeAbout this journey
Puget-Théniers station sits at the point where the Ligne de Nice à Digne — known locally as the Train des Pignes — reaches the first deep folds of the southern Alps. The metre-gauge line, which is 1,000 mm, dates from the 1890s: construction began in 1890, a partial opening served Puget-Théniers in 1892, and the railway reached Annot in 1908. The entire line between Nice and Digne was formally inaugurated from 5 to 7 August 1911.
The section between Puget-Théniers and Annot is the only part of the line where steam trains run today, operated during the summer season. That distinction reflects the segment's character: the route passes through terrain marked by sandstone formations rising within limestone mountains, and the demanding mountain environment is not merely scenic — a rockfall derailed a train near Annot on 9 February 2014. Scaffarels station, an optional stop built on a masonry embankment, is typical of the line's light infrastructure along this stretch.
Annot station sits at 680 metres altitude, where the village lies within a resurgence of sandstone up to 250 metres thick. The journey from Puget-Théniers ends at a landscape shaped as much by geology as by railway history, and the CP E211 Mallet locomotive hauling this summer service is itself part of what draws passengers into these mountains.
Route
- Start Puget-Théniers
- End Annot
- Distance ~19.8 km
- Filmed 2025-06