Croatia
Zagreb to Virovitica Cab Ride
Watch on YouTubeAbout this journey
The journey begins at Zagreb Glavni kolodvor, the largest station in Croatia and the main hub of the Croatian Railways network. The Neoclassical station building, 186.5 metres long, dates to a construction project authorised by the Croatian-Hungarian Parliament on 15 January 1890 and confirmed by Emperor Franz Joseph I on 31 March 1890.
Heading northeast, the route makes use of the L214 bypass line between Gradec and Sveti Ivan Žabno, opened on 15 December 2019 — the first newly built railway corridor in Croatia since 1967. The 12.5 km line, whose construction began in December 2015, allows trains to reach Bjelovar directly rather than reversing at Križevci as they once had to, cutting Zagreb–Bjelovar travel time by around 50 minutes. The line is rated for speeds of up to 120 km/h. From December 2022, through diesel services have linked Zagreb with Bjelovar, Virovitica, and beyond.
The final stages of the run approach Virovitica, a town in the historic Slavonian region close to the Drava river and the Hungarian border. The area carries a long history: Virovitica was under Ottoman rule from 1552 to 1684. The locomotive hauling this journey is an HŽPP Class 2044, operating as a diesel unit across the full route.
Route
- Start Zagreb
- End Virovitica
- Distance ~148.1 km
- Filmed 2023-03
Chapters
- 0:00 Preview
- 01:17 Zagreb Glavni kol.
- 02:52 HŽPP SERIES 1141 (KONČAR)
- 03:10 HŽPP SERIES 6112 (KONČAR)
- 04:07 HŽPP SERIES 6112 (KONČAR)
- 05:41 ZAGREB EAST STATION (ABANDONED)
- 07:50 Maksimir
- 08:53 ZAGREB BORONGAJ (CARGO-ONLY)
- 09:27 Trnava
- 10:40 Čulinec
- 10:51 TO EAST BYPASS / SISAK
- 11:44 FROM EAST BYPASS / SISAK
- 12:12 Sesvetska sopnica
- 14:40 Sesvete
- 14:48 HŽPP SERIES 7121 (MACOSA)
- 17:43 A4 HIGWAY (VARAŽDIN/HUNGARY)
- 19:20 Sesvetski Kraljevec
- 21:13 HŽCARGO SERIES 1141 (KONČAR)
- 21:58 START OF DUGOSELO-KRIŽEVCI UPGRADE
- 23:43 Dugo Selo
- 23:44 HŽPP SERIES 6112 (KONČAR)
- 26:29 To Novska/Vinkovci
- 27:43 FUTURE DEVIATION TO NOVSKA/VINKOVCI
- 28:49 FUTURE DEVIATION FOR 160KM/H
- 31:35 BoŽjakovina
- 34:16 RIVER LONJA
- 41:22 Vrbovec
- 46:24 RIVER ČRNEC
- 49:28 GRADEC STAJALIŠTE
- 50:43 NEW LINE TO BJELOVAR
- 53:22 Repinec
- 58:10 WORK TRAIN WITH BALLAST
- 59:02 From Bjelovar
- 59:38 IŽEVCI
- 1:00:22 LOCOMOTIVE TURNAROUND
- 1:01:11 START OF KRIŽEVCI-KOPRIVNICA UPGRADE
- 1:02:34 OUR TRAIN
- 1:05:51 KRIŽEVCI
- 1:06:40 TO DUGO SELO / ZAGREB
- 1:07:02 LOCAL LINE KRIŽEVCI-BJELOVAR-KLOŠTAR
- 1:08:48 RIVER GLOGOVNICA
- 1:09:00 D10 highway
- 1:11:22 Ploljanka
- 1:17:11 Brezovljani
- 1:21:44 škrinjari
- 1:23:23 FROM GRADEC / DUGO SELO
- 1:24:41 Sveti Ivan Žabno
- 1:24:52 HŽ series 2062
- 1:27:54 Cirkvena
- 1:30:08 Hrsovo
- 1:32:40 Rovišće
- 1:33:59 Žabjak
- 1:37:49 Klokočevac
- 1:40:46 Stare Plavnice
- 1:44:47 Bjelovar
- 1:51:06 GRGINAC
- 1:52:32 Grginac Novi
- 1:55:15 Veliko Trojstvo
- 1:57:57 Mišulinovac
- 2:00:34 HILLY AND WINDING PART AHEAD
- 2:02:03 Paulovac
- 2:03:49 PAULOVAC TUNNEL (360M)
- 2:08:32 ZID KATALENA
- 2:12:12 Sirova Katalena
- 2:19:21 MAIN LINE FROM KOPRIVNICA/VARAŽDIN
- 2:19:56 ENTERED RIVER DRAVA VALLEY
- 2:21:36 Kloštar
- 2:21:41 HŽ series 7121
- 2:21:50 HŽ SERIES 2044 (EMD GT22HW-2)
- 2:24:45 NEW LEVEL CROSSING (INACTIVE)
- 2:27:09 NEW LEVEL CROSSING (INACTIVE)
- 2:33:17 Pitomača
- 2:33:23 HŽ series 7121
- 2:33:45 RECENTLY REPAIRED LINE TO VIROVITICA
- 2:40:42 Vukosavljevica
- 2:43:28 OLD SIGNALLING STILL IN USE
- 2:43:37 OLD SIGNALLING STILL IN USE
- 2:44:02 Špišić-Bukovica
- 2:50:23 RIVER OĐENICA
- 2:50:59 Virovitica Grad
- 2:51:38 END OF REPAIED SECTION
- 2:52:22 VIROVITICA