France

Avignon-Centre to Lyon Perrache Cab Ride

Filmed 2026-08 Published 21 October 2026
Watch on YouTube

About this journey

The journey departs from Avignon-Centre station, whose neoclassical façade was built in 1866 to designs by architect Louis-Jules Bouchot. From the outset the line heading north is the historic Paris–Lyon–Marseille mainline, completed in 1855 and electrified with 1,500 V DC — a catenary heavy enough to power TGV trains at up to 200 km/h. The first kilometres thread through the Provence-Alpes-Côte d'Azur region past vineyards and the Rhône corridor, with the A7 Autoroute du Soleil running close alongside for much of the route south of Valence.

Beyond Bollène–La Croisière, the line crosses into Auvergne-Rhône-Alpes and enters the Défilé de Donzère, a 3 km gorge considered the northern boundary of the Mediterranean climate. The Rhône remains a near-constant presence: the river is fully navigable as far as Lyon, and the valley is shared by the old PLM mainline, a freight-only west-bank line, and the LGV Méditerranée running some 10–20 km to the east. Stops at Montélimar, Valence-Ville — whose station building shares the same Bouchot design as Avignon-Centre — and Tain-l'Hermitage–Tournon mark the middle passage through the Drôme and Ardèche landscapes.

North of Vienne the track expands to four lines as Lyon approaches. Lyon-Perrache station, opened in 1857 on Lyon's Presqu'île peninsula, was built in just 18 months starting in 1855 by François-Alexis Cendrier for the Chemin de fer de Paris à Lyon. Designed to unify three competing companies — which merged to form the PLM as the station opened — it remains in active use, and a rebuilding targeting its intermodal terminal is planned for completion by 2030. The journey thus runs from one Bouchot neoclassical terminus to one of France's great Victorian railway set pieces, covering 230.8 km of the original Paris–Marseille spine.

Route

  • Start Avignon-Centre
  • End Lyon Perrache
  • Distance ~231 km
  • Filmed 2026-08

Chapters